An installation of 6 units which included four ducted systems and two one way blow units from LG, the customer requested the install to be as discreet as possible which in this situation we were able to conceal all major pipe work in drainage pipe.







Case Studies
An installation of 6 units which included four ducted systems and two one way blow units from LG, the customer requested the install to be as discreet as possible which in this situation we were able to conceal all major pipe work in drainage pipe.






